PHASE 3 OF PORT DOVER'S MAIN STREET RECONSTRUCTION NOW UNDERWAY
4/19/2017 7:13:29 AM


The smell of hots dogs in the air, seagulls flying over the head, the waves crashing on the beach, and construction crews digging up pavement -- It's springtime in Port Dover.

Phase 3 of the Main Street Reconstruction is now underway, having people detour around the main drag between Chapman and McNab Street.

Main Street is expected to be closed until July 17th.

There are also some side roads scheduled to get paved during construction.

Crews are expected to have that completed in September.

This should give the town plenty of time to get ready for the spooky Friday the 13th this October.
   

WebReadyTM Powered by WireReady® NSI  |  © Copyright 2008-2013 My Broadcasting Corporation

Back to News


 
 
 
 
 
 
 
 
 
 
 

Copyright 2017 NorfolkToday.ca. All rights reserved.

This site powered by PromoSuite Interactive